Freedom Homes · Costa Mesa1953 Republic Ave · PADU-26-0037 · in plan reviewNo public hearing scheduled

Freedom Homes · Westside Costa Mesa

Save the Freedom Homes.

An investor LLC plans to tear down a single-family home on Republic Ave and put four 2-story, 3-bedroom units on the lot. A second project is already filed at 900 Arbor St, the entrance to our tract. State law lets most lots here do the same, with no public hearing. If we stay quiet, Freedom Homes gets rebuilt into investor rentals one lot at a time.

We support neighbors who add an ADU to their own home. We oppose investors stacking four rentals on a single-family lot.

  • 1953 Republic Ave1 home → 4 units
  • 900 Arbor St1 home → 4 units
  • Your street?Most lots qualify
—neighbors have signed
Proposed site layout, 1953 Republic Ave Diagram of the lot: a two-unit main building at the front with garage space, and two detached two-story units behind it with no garage. LOT LINE ADU 1 ADU 2 2-STORY · 3 BR 2-STORY · 3 BR NO GARAGE FOR REAR UNITS UNIT A UNIT B 2-STORY · 3 BR 2-STORY · 3 BR SOME GARAGE SPACE ~1,200 SQ FT EACH · 12 BEDROOMS TOTAL REPUBLIC AVE
Schematic from the neighbor fact sheet, not to scale. Before: one single-family home.
OCT 2026
16
FRIDAY · 7 PM

Neighborhood meeting: short- and long-term options

Hosted by Dan and Alexis Taylor (35 years in the tract) at 1949 Republic Ave. Everyone's welcome, kids included.

Can't make it? Call or text Alexis at 949-230-6429 or email alexistaylor200@gmail.com.

The straight story

What's planned, and what the law allows

1953 Republic Ave

Owner
Oceanview RE2 LLC (investor group)
Permit
PADU-26-0037
Filed
March 30, 2026 · in plan review
Planner
Justin Arios · 714-754-5667
Plan
Demolish the house. Build a 2-story front building split into two 3-BR units with some garage space, plus two detached 2-story 3-BR units behind it with no garage. About 1,200 sq ft each.
Owner on site
Not required

900 Arbor St (tract entrance, 19th St side)

Owner
Same principal as Republic Ave
Permit
To be confirmed with the City
Filed
April 17, 2026 · in plan review
Plan
Remodel the existing 1,237 sq ft house with a 3-car garage, add a 1,200 sq ft 2nd-floor ADU, a detached 2-story ADU, and an SB 9 unit.
Parking
Already limited by red curbs around the property

How four units fit on one lot. California's SB 9 lets an owner build two primary homes on a single-family lot. State ADU law then allows accessory units on top of that. Costa Mesa's code (§13-36) caps the total at four. The state housing department (HCD) has told cities they cannot use SB 9 to block ADUs on a lot that hasn't been split.

Why there's no hearing. Both laws make these permits "ministerial." If the plans meet the City's written, objective standards, the City must approve them, with no public hearing and no notice. Parking, density and lost views can't be grounds for denial.

Where neighbors still have leverage: making sure every objective standard is actually met, pushing for construction rules and parking solutions, and asking the City Council to tighten its standards for the next project. Volume matters. Planners and council members notice when dozens of residents write in.

Step 1 · Sign

Sign to protect Freedom Homes

This petition goes to the Mayor and City Council. Each signature is time-stamped by the server the moment you submit and listed below with your name and street. Your house number and email stay private and go only to the organizers and the City.

Freedom Homes: homes for families, not investor stackingFreedom Homes is a neighborhood of single-family homes. We support homeowners who add an ADU to their own property. We oppose investors turning single-family lots into four-unit rental properties. Two lots in our tract, 1953 Republic Ave (PADU-26-0037) and 900 Arbor St, are being redeveloped this way, with no public hearing. We, the undersigned residents, ask the City of Costa Mesa to: 1. Hold 1953 Republic Ave and 900 Arbor St to every existing standard. If the City treats the new duplex as multifamily in order to allow two detached ADUs, apply Costa Mesa's multifamily ADU size limit (850 sq ft, or 1,000 sq ft with more than one bedroom), and confirm compliance in writing before any permit is issued. 2. Publish the submitted plans and correction letters for both projects. 3. Adopt stricter standards for lots with two or more primary homes: detached ADUs limited to the minimum height state law requires, plus on-site parking and privacy requirements. Leave today's rules unchanged for a homeowner adding one ADU to a single-family home. 4. Create a registration and inspection program for single-family lots converted to three or more rental units. 5. Formally support state legislation requiring owner-occupancy for SB 9 two-unit developments, as SB 9 already requires for lot splits. 6. Notify neighbors within 500 feet when ADU and SB 9 permits are filed and approved. 7. Bring items 3 through 5 to a City Council vote within 90 days. We will ask every candidate for Mayor and City Council on the November 3, 2026 ballot where they stand.

Petition text fingerprint (SHA-256): loading…

Only the street name is shown publicly.
Private. Used to prevent duplicate signatures and for meeting updates.

Public signature roll

Loading signatures…

#NameStreetRelationSigned (Pacific)Receipt
Signatures will appear here as neighbors sign. Be the first.

How to verify. Every signer gets a receipt: a SHA-256 fingerprint of their public entry and the exact petition text. Paste yours below to confirm your entry is still on the roll and unchanged. Your browser recomputes the fingerprint itself. The roll fingerprint changes whenever any entry is added, changed or removed, so anyone can save it and check later.

Step 2 · Write

Email the City in two minutes

Fill in your details once, then copy each letter or open it in your email app. A sentence in your own words makes a letter count for more. Send each letter yourself. One letter per household member is fine.

Your details

These stay in your browser. Nothing here is sent anywhere until you send the email yourself.

Every avenue

What can actually change the outcome

State law makes an outright stop very unlikely. These are the levers that are real, roughly in order of how soon they matter.

Now · before permits issue

Make the City check every standard

Ministerial doesn't mean automatic. The plans must meet Costa Mesa's written standards, and second-story ADUs have extra conditions. Ask the planner to confirm each one in writing:

  • Second-floor ADU portions 25 ft back from the front line, with interior or screened stairs (§13-35(9))
  • Side windows within 25 ft of a neighbor's home: 5-ft sill height (§13-35(9))
  • No roof decks; balconies only where allowed, screened near neighbors (§13-35(10))
  • 6-ft separation between buildings; landscaping and 40% open space (§13-35, §13-32)
  • One garage space per primary unit (§13-36(c)(6))
  • Demolition limits if the home was tenant-occupied in the last 3 years (§13-36(b))
  • The size question: if the City counts the new duplex as multifamily to allow two backyard units, its own multifamily cap (850 sq ft, or 1,000 with 2+ bedrooms) should apply instead of 1,200 (§13-35)
Now

Get the plans: public records request

Request the full plan set, correction letters and correspondence for both properties. A neighbor with design or construction experience can then check them line by line. Template under "Records request" above.

Now · and during construction

Construction rules and enforcement

Ask for a construction management plan: work hours, contractor parking, staging, dust, street cleanup. Once work starts, report violations to Code Enforcement every time, with photos and times. A documented record matters.

Next few months

Parking: study, then permit parking

Costa Mesa's residential permit parking program needs a city parking study showing at least 70% occupancy and a petition from 51% of households on a zone of about four blocks. Request a before-and-after study now so the data exists when the units fill up.

Worth checking

Tract deed restrictions (CC&Rs)

Many 1950s–60s tracts recorded "single-family only" covenants. California voids covenants that block ADUs (Civil Code §714.3), but SB 9 itself doesn't address private covenants, so a covenant might still apply to the second primary unit. Pull the tract's recorded restrictions from the OC Clerk-Recorder and have a land-use attorney review them. A few neighbors splitting one consultation is affordable.

Long term

Change the rules for the next one

State law bars cities from requiring ADU owners to live on site, so the City can’t sort projects by who owns them. It can set stricter standards for lots with two or more primary homes, the pattern investors use, without touching a homeowner adding one ADU. The owner-occupancy fix itself has to come from Sacramento: SB 9 already requires it for lot splits, but not for two-unit projects like this one. Ask candidates on the Nov 3 ballot where they stand, and write your state Assembly member and Senator.

What tends to backfire

  • Arguments about who might rent the units. They carry no weight under state law and can raise fair-housing concerns. Stick to standards, safety, parking and privacy.
  • Asking the City to deny a compliant project. State law bars it, and the state can penalize cities that do. Ask for strict compliance instead.
  • Confronting the owner, contractors or future tenants. Keep everything in writing, factual and with the City.